Projects

Removal of an existing heat only boiler in Brentwood

Removal of an existing heat only boiler, tanks and cylinder. Replaced with an ideal Max 30C combination boiler. 10 years parts and labour warranty as standard. System chemically cleaned and treated. Previous Next

Intermittent leak was reported in Buckhurst Hill

Attended to a property where an intermittent leak was reported whilst the shower was in use. The shower control sealing plate was not sealed back to the tiles. This was causing the water to run behind and through to the ceiling below. This plate was sealed and left to set.
1 2 3