Bathroom completely refurbished in Chelmsford
Bathroom completely refurbished to customers specifications. Very happy with the end result Previous Next
Removal of a faulty immersion heater in Chipping Ongar
Removal of a faulty immersion heater and replaced with new
Removal of an existing heat only boiler in Brentwood
Removal of an existing heat only boiler, tanks and cylinder. Replaced with an ideal Max 30C combination boiler. 10 years parts and labour warranty as standard. System chemically cleaned and treated. Previous Next
Intermittent leak was reported in Buckhurst Hill
Attended to a property where an intermittent leak was reported whilst the shower was in use. The shower control sealing plate was not sealed back to the tiles. This was causing the water to run behind and through to the ceiling below. This plate was sealed and left to set.
Attended to a property where the system pressure was dropping in Buckhurst Hill
Attended to a property where the system pressure was dropping. The expansion vessel was found to be at zero. Causing the boiler to loose pressure. The vessel was reinflated, tested for correct operation and left working.
Removal of an existing flexible kitchen tap in Hutton, Havering
Removal of an existing flexible kitchen tap. Replaced with new mono block taps.
Removal of an existing and hot water cylinder – Loughton
Removal of an existing floor mounted heat only boiler and hot water cylinder. In its place an ideal logic C35 with 10 years parts and labour warranty was fitted. The system was chemically cleaned, then treated.
The removal and replacement of an existing filler valve – Loughton
The removal and replacement of an existing filler valve